Customization: | Available |
---|---|
Type: | Crawler Excavator |
Usage: | Special Excavator, Marine Excavator, Mining Excavator |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
SANY SY55U Trench Digging Machine Excavator Price in China
1. High efficiency and reliability
The customized Isuzu 4JG1 Engine with Tier 3 emission standard shows extra-strong working power, ensuring the high reliability especially in the tough working environment.
2. High Reliability and Stability
Equipped with reinforced attachment and X-shape undercarriage, the machine's performance is more reliable, the life of structure is improved by 10%.
3. Comfortable operation and easy maintenance
The spacious view and suspension seat design, together with the damping and noise-reduction performance, gives the operator more confortable experience.
The large covering parts makes the maintenance more easily and approachable.
4. Energy efficient and Environmentally Friendly
Environmentally friendly engine, equipped with new controller, the fuel combust more sufficiently. The fuel consumption is 8% lower than last generation in the same efficiency.
Specifications of SANY SY55U Trench Digging Machine Excavator Price in China
Wheel Track | 1990 mm |
Rated power | 31.2/2200 kW/rpm |
Emission standard | Tier 3 |
Operating weight | 5200 kg |
Std. track shoe length | 2510 mm |
Bucket capacity | 0.18 m3 |
Overall Height | 2620 mm |
Overall Length | 5375 mm |
Delivery Site
Producing Environment of SANY SY55U Trench Digging Machine Excavator Price in China
Certification of SANY SY55U Trench Digging Machine Excavator Price in China
Company Information
SANY On Exhibition
1: What kind terms of payment can be accepted?
A: For terms of payment, L/C, T/T, D/A, D/P, Western Union (can be) could accepted
2: What certificates are available in Machinery?
A: For the certificate, we have CE, ISO, Gost, EPA(USA)CCC,
3: What about the delivery time?
A: 7-20 days after receiving the deposit.
4: What about the warranty time?
A: 12 months after shipment or 2000 working hours, whichever occuts first.
5. What about the Minimum Order Quantity?
A: The MOQ is 1 pcs